Monday, December 8, 2008

The Khalife guarantees that Touba work continues

The massive intrastructure and public improvements underway in Touba continue, according to the Khalife of the Mourides, by way of a news report. He assures that the water system infrastructure and other projects were never stalled.

The Khalife, Serigne Mouhamadou Lamine Bara Mbacké, took efforts to emphasize the cooperation of the Holy City with the President of Senegal, Abdoulaye Wade:

"The water project has started. Again, we are in step with the president because he had given the sum of seven billion CFA francs. Then he comes back three and a half billion for drilling, pipes, fountains throughout the city."

Addressing reports that the work had been stopped for lack of funding, the Khalife was reported to state: "The work has never been suspended. Those who say they do not know anything."

Since President Wade showed up with the payments in his recent visit to Touba, relations with the Holy City appear to have warmed up considerably. This at a time when the president is facing political opposition.

No comments: